The current fire station was built in 1977 by the members of the fire company. These members built the building with rough cut lumber that was sawed and milled from their own properties. Throughout that time interior rooms had been added such as two offices, a radio/communications room, two bathrooms, and two storage rooms. With the creation of the offices and radio/communications room the 1st bay was closed off. Coventry Fire currently houses the following Company owned equipment.
|
|
The Fire Company has done a mockup of what is expected the current 60'x67' fire station will remain as the truck garage. The long lasting closed first bay will be re-opened providing the company 4 equipment bays. The offices and kitchen will be removed as well as the two storage rooms behind old bay 1 (now bay 2). This will allow for all fire apparatus dedicated space in the building, with no need for the additional steel building. We will also be closing the truck garage off from the new adjoined building to protect our community and crews from unnecessary carcinogens.
The NEW addition will be adjoined to the current fire station, with a single controlled badge access door from the "clean space" to the "dirty space". The new fire hall/community space will be 60'x80'. This addition will have one combined leadership office, a new state of the art kitchen, and complete ADA bathrooms with a shower in each bathroom. This layout provides the fire company approximately 375 seated persons compared to our current 270 seated person occupancy. We have the following goals for this project:
|